Iolani/Liholani/Makani Rd. Pavement Reconstruction
FAP No. STP-0900(099) Contractor: Hi-Built LLC Project Cost: $12,243,207.93 NTP: 02/08/2021 Description: This project includes roadway reconstruction, which includes removal of existing roadway asphalt concrete & Portland concrete and constructing new asphalt concrete pavement section for roadways, including segment of Portland Cement Concrete Pavement section; Intersection improvements, including striping and signage; removal and replacement of damaged and/or deteriorating drainage facilities; constructing concrete curbs, gutters, sidewalks and curb ramps; installing new roadway signs, striping and pavement markers; relocating existing signs; rehabilitation of existing twin-120” culverts along Liholani Street, including 8” shotcrete lining of existing CMP culverts, headwall repair and rehabilitation, protection of existing overhead power lines and appurtenances; masonry retaining walls; chainlink fences; and all other incidental work necessary to complete the project.
Link to page -
Kahana Nui Bridge Replacement
FAP No. BR-3080(009) Contractor: Goodfellow Bros. LLC Project Cost $5,323,615.70 NTP: 02/08/2022 Description: The project includes demolition and removal of existing bridge structure footing and abutment walls, existing utilities, landscaping, and concrete curb and gutter, sidewalk and driveways; construction of new asphalt concrete pavement, new concrete gutter, utility improvements, new bridge structure, footing and abutment walls, driveways, sidewalk and curb ramps, signing and striping; and all other incidental work necessary to complete project.
Link to page -
Mill Street Pavement Reconstruction
FAP No. STP-3840(001) Contractor: Maui Kupono Builders Project Cost: $4,101,628.87 NTP: 02/28/2022 Project Description: The project involves the removal of existing pavement down to gravel subbase within the roadway right-of-way and installation of new asphalt concrete pavement section with reinforcing geogrid; removal and widening of existing sidewalks, removal/installation of new curb/gutters, removal/replacement of existing curb ramps and driveway aprons, installation of new pavement striping and markers, adjusting manholes/valves frames and covers where needed, removal/replacement of existing drainlines, removal/replacement of existing catch basins and drain manholes, and removal/replacement of signage and posts. Portion of existing retaining wall along Mill Street will also be removed and replaced with new retaining wall.
Link to page -
Old Haleakala Highway Traffic Signal Improvements
FAP No. STP-0367(001) Contractor: Paul's Electrical Contracting, LLC Project Cost: $497,700.00 NTP: TBD Description: This project involves upgrading an existing traffic signal system to current standards. Construction work includes furnishing and installing new signal poles, vehicle signals, pedestrian signals, pullboxes, conduits, above-ground radar detection, preemption devices, controller assembly, electric meter; pavement striping and markers; removing/adding signage and posts; removal of existing hedge; and all other incidental work necessary to complete the project.
Link to page -
Onehee Avenue Roadway Improvements
FAP No. STP-3960(001) Contractor: Hawaiian Dredging Construction Project Cost: $7,024.500.00 NTP: 02/04/2022 Description: The scope of work consists of pavement reconstruction within the road right-of-way. The scope of work also includes removal of existing sidewalks, installation of new raised concrete sidewalks and bike lanes, installation of new curb/gutters, removal/replacement of existing curb ramps and driveway aprons, installation of new pavement striping and markers, adjusting manholes/valves frames and covers where needed, removal/replacement of existing drainlines, waterlines and sewer lines, installation of new catch basins and drain manholes, and removal/replacement of signage and posts.
Link to page -
South Kihei Road Pavement Rehabilitation
FAP No. STP-3100(016) Contractor: Maui Kupono Builders Project Cost: $6,273,745.71 NTP: 11/26/2021 Description: The project involves the removal and replacement of asphalt pavement, installation of concrete curb, gutter, and sidewalk, removal and replacement of curb ramps, installation of pavement striping and markers, and installation of cured-in-place pipe inside existing drainlines.
Link to page -
Central, South, and West Maui District Resurfacing
Project No. 20-10 Contractor: Maui Kupono Builders Project Cost: $1,570,912.77 NTP: 12/06/2021 Description: This project involves cold planning and resurfacing of various roads in the Central, South, and West districts of Maui. The scope of work includes cold planing; road resurfacing; pavement striping and markers; adjustments of manholes and water valves; installation of signs; installation of curb ramps; replacement of a concrete thru gutter; and other incidental items.
Link to page -
Central Maui District Resurfacing (FY 2021)
Project No. 21-02 Contractor: Maui Kupono Builders Project Cost: $365,521.00 NTP: TBD Description: The project involves cold planning and resurfacing of Lunalilo Street; Kamamalu Place and Lihiliho Street (Lunalilo Street to Lihi Street) in Wailuku, Maui. The scope of work also includes reconstruction of existing speed humps; adjustment of manholes and water valves; replacement and relocation of signage; pavement striping and markers; and other incidental items.
Link to page -
County Courthouse Basement Renovation
Project No. 21-19 Contractor: Maxum Construction of Hawaii Project Cost: $360,465.15 NTP: TBD Description: Work includes interior improvements to the existing storage room located in approximately 600 SF on the lowest level of the Old Courthouse Building, Wailuku Maui. The improvements will convert the storage room into a meeting room. Improvements include select demolition, repair and repaint existing finishes. New ceiling clouds, with higher performing acoustic ceiling tiles, suspended metal ceiling grid, adding lights with energy efficient LED bulbs. Electrical and mechanical improvements include removing the window AC unit and adding a new split system AC system to the space. A wood slat screen wall is being added to conceal existing mechanical and electrical equipment within the room.
Link to page -
East Maui District Resurfacing (FY 2019)
Project No. 19-19 Contractor: Maui Paving, LLC Project Cost: $443,111.00 NTP: TBD Description: The project involves cold planing and resurfacing Hana Highway from the south end of Haneoo Road in Hana to 1.1 mile south. The scope of work includes cold planing the existing pavement; road resurfacing; pavement striping and markers; adjustment of manholes and water valves; and other incidental items.
Link to page -
East Maui District Resurfacint (FY2022/2023)
Project No. 22-11 Contractor: Maui Kupono Builders Project Cost: $785,182.00 NTP: TBD Description: The project involves resurfacing of Piilani Highway in Kaupo, Maui from milepost 32.75 to milepost 34.33. The scope of work also includes cold planning transitions; pavement striping and markers; removal of signage; and other incidental items.
Link to page -
Emergency Kaupakalua Bridge Replacement
Project No. 21-49 Contractor: Goodfellow Bros. Project Cost: $2,198,888.00 NTP: TBD Description: The scope of work for this project involve installing a pre-engineered steel bridge on concrete abutments supported on micropiles; AC pavement road and ramp section to replace the damaged asphalt; concrete approach slab and guardrails at both approaches; installing rip rap slopes to repair the eroded shoulders; installing pavement markings and signage; and other incidental work.
Link to page -
Emergency Repair of Awalau Road
Project No. 21-50 Contractor: Goodfellow Bros Project Cost: $1,054,888.00 NTP: TBD Description: The scope of work for this project involve installing a concrete pavement section to replace the damaged asphalt concrete pavement; installing GRP slopes to repair the eroded shoulders; replacing guardrails; repairing undermining at the CRM abutments and wingwalls of the existing bridge culvert; replacing a barbed wire fence; installing pavement markings and signage; and other incidental work.
Link to page -
Emergency Repair of Kaupakalua Road In the Vicinity of Lepo Street - Phase 1
Project No. 21-48 Contractor: Maui Kupono Builders Project Cost: $704,531.00 NTP: 11/14/2022 Description: The project involves shoulder restoration with retaining walls, Construction work includes new paved shoulders and guardrail installation, new concrete walls with soil nails to support the shoulder area, and grading.
Link to page -
Emergency Repair of Piilani Highway Culverts near Nuu Bay
Project No. 21-53 Contractor: Goodfellow Bros. Project Cost: $1,502,461.25 NTP: TBD Description: The scope of work for this project involves the demolition and removal of the existing 8’ by 5’ corrugated metal arch culverts crossing Piilani Highway and associated structures; construction of a 18’ x 5’9” corrugated aluminum structural plate single arch culvert with concrete paved invert, footings, and headwalls; clearing and grubbing; earthwork; placing grouted rubble paving; reconstruction of pavement areas; installation of guardrails, pavement markings and other incidental items.
Link to page -
Emergency Repair of South Kihei Road at Various Locations
Project No. 22-37 Contractor: TJ Gomes Trucking Co. INC. Project Cost: $407,410.00 NTP: 03/07/2022 Description: The project involves reconstructing the existing pavement at the makai shoulder along South Kihei Road in several locations. The roadway shoulder will also be backfilled and landscaped using beach sand from the NOAA Kihei Whale Sanctuary. Other work such as striping, replacement of a concrete manhole collar, and repair of wooden fence is included.
Link to page -
Emergency Slope Repairs at Manawainui Gulch
Project No.: 22-43 Contractor: Prometheus Construction Project Cost: $239,084.00 NTP: 07/16/2022 Description: The project includes scaling of loose rocks from the slope and disposal of the same, removal and disposal of debris, repair of existing wire mesh, replacement of guardrail and other incidental items.
Link to page -
Kahului Fire Station Sidewalk Improvements
Job No. 18-03 Contractor: Betsill Brother LLC Project Cost: $110,986.97 NTP: TBD Description: The project involves constructing a concrete curb and sidewalk along the Kahului Fire Station frontage, demolition of existing walls, grading, construction of grade walls, relocation of fire hydrants, and striping.
Link to page -
Kalana O Maui Building Roof Top Anchors
Project No. 20-47 Contractor: Ornellas Enterprise, LLC Project Cost: $69,713.48 NTP: TBD Description: The project involves installation of fall arrest anchors located on the roof top of the Kalana O Maui building. Anchors will be installed in existing concrete wall and slab along the parapet walls and on top of the mechanical and elevator room flat roof. Ensure sealing and waterproofing of anchor attachments.
Link to page -
Kalana O' Maui Facade Repair Project
Project No. 21-16 Contractor: Maxum Construction of Hawaii Project Cost: $1,191,300.00 NTP: TBD Description: Work includes exterior repairs to the facades of the Kalana 0 Maui Building, Wailuku Maui. The improvements will address deterioration and spalling hazards of exterior pre-cast panels, transparent coating of exterior poured in place concrete walls and pre-cast panels and re-sealing existing single pane glass windows perimeter seals to address water infiltration.
Link to page -
Kalana Pakui AC Replacement
Project No. 18-26 Contractor: MEI Corporation Project Cost: $54,525.46 NTP: TBD Description: The work includes the furnishing of all labor, tools, materials, and equipment necessary to install a replacement air conditioning system for Kalana Pakui building, Wailuku, Hawaii.
Link to page -
Kamehameha Avenue Street Light at Mahaolu Street
Project No. 18-19 Contractor: HI-Built, LLC Project Cost: $39,215.00 NTP: TBD Description: The project involves installing a street light pole foundation, conduit, and pullbox, and replacement of concrete sidewalk.
Link to page -
Lanai District Resurfacing (FY 2018/2019)
Job No. 18-17 Contractor: Peterson Bros Project Cost: $419,669.80 NTP: 03/08/2022 Description: The project involves cold planing and resurfacing Houston Street (from Third Street to Sixth Street), Houston Place, Palawai Street, and Eleventh Street; adjusting manholes and water valves; installing pavement striping and markers; and other incidental items.
Link to page -
Lanai District Resurfacing (FY2020/2021)
Project No. 20-16 Contractor: Peterson Bros. Construction, Inc. Project Cost: $666,666.60 NTP: 02/28/2022 Construction: The project involves the cold planing and resurfacing of various roads in Lanai City, Lanai. The scope of work also involves installing concrete sidewalks, driveways, and curb ramps; installing pavement striping and markers; adjusting manhole and water valve frames and covers; installing signs; and other incidental items.
Link to page -
Molokai District Resurfacing (FY2020/2021)
Project No. 20-51 Contractor: Seal Pros, LLC Project Cost: $581,959.00 NTP: TBD Description: This project involves the reconstructing the pavement of various roads in Kalae, Molokai. The scope of work also involves pavement striping and markers; adjustment of manholes and water valves; installation of signs; and other incidental items.
Link to page -
Ohukai Road Sidewalk Improvements (FY 2020)
Project No. 19-16 Contractor: Betsill Brother, LLC. Project Cost: $654,104.64 NTP: TBD Description: The project involves removal of roadway sidewalk improvements, pavement by cold planing, fences, and trees; adjustment to existing fire hydrants and meter boxes; relocation of signs, mailboxes, and trees; installation of hot mix asphalt pavement, concrete curbs, sidewalk, driveways, curb ramps, and root barrier; and other associated work.
Link to page -
Old Haleakala Highway Sidewalk Improvements
Project No. 19-15 Contractor: West Maui Construction Project Cost: $1,962,628.00 NTP: 04/04/2022 Description: The project includes construction of approximately 2,425 LF of reinforced concrete sidewalk on the mauka side of Old Haleakala Highway from Mohala Street to Loha Street. The scope of work includes removal of obstructions; construction of intersection ramps; relocation of exiting water meters and standpipes; installation of storm drainage features; pavement striping; traffic sign installation; grade wall installation; and other incidental items.
Link to page -
Paia-Haiku District Resurfacing (FY 2021)
Project No. 21-38 Contractor: Maui Kupono Builders Project Cost: $586,088.00 NTP: TBD Description: The project involves cold planning and resurfacing of Pilialoha Street, Lelehuna Place, Puu Koa Place, Kahope Place, Waikina Loop (County portion), Nehe Place, Lilikoi Road (Makai intersection with Kokomo Road to Nahoa Place), and Kaluhea Place in Haiku, Maui. The scope of work also includes pavement reconstruction; reconstruction of existing speed humps; repairs of sidewalks, rolled curbs, and driveways; adjustment of manholes and water valves; pavement striping and markers; installation of signs; and other incidental items.
Link to page -
Pavement Reconstruction of Kalae Roads & Resurfacing of Airport Loop Road
Project No. 22-35 Contractor: Maui Paving, LLC Project Cost: $1,168,526.25 NTP: TBD Description: The project involves the reconstructing the pavement of various roads in Kalae and resurfacing of the Airport Loop Road in Hoolehua. The scope of work also involves pavement striping and markers; adjustment of manholes and water valves; installation of signs; and other incidental items.
Link to page -
Piilani Highway Slope Stabilization at Nuanualoa Gulch
Project No.: 20-42 Contractor: Prometheus Construction Project Cost: $1,370,224.90 NTP: 06/27/2022 Description: The project involves repair of Piilani Highway near Nuanualoa Gulch that was damaged by a landslide. The severely eroded soil slope is located just downslope of a recently constructed tieback and micro pile concrete wall and soil nailed shotcrete. The roadway is currently open and stable, no cracking or visual joint separation between pavement and concrete wall was observed. The scope of work includes clearing, reinforced shotcrete slope with grouted soil nails, erosion control matting with mechanical earth anchors, hydromulch seeding, BMPs, traffic control, and other incidental items.
Link to page -
Pukalani Terrace Subdivision Roadway Conditions
Job No. TBD Contractor: TBD Project Cost: TBD NTP: TBD Description: The County of Maui, Department of Public Works, recognizes the poor roadway conditions throughout the Pukalani Terrace Subdivision. Unfortunately, these roads have a poor quality material beneath the asphalt pavement which is not suitable to support a new pavement layer. Therefore, we are not able to simply repave the roads and instead complete pavement reconstruction is required throughout the subdivision. This expensive treatment reduces the length of roads that can be addressed per year.
Link to page -
South Kihei Road Sidewalk Improvements - Phase 3
Project No. 19-13 Contractor: Hawaiian Dredging Construction Project Cost: $1,201,484.00 NTP: TBD Description: The project involves removal of roadway sidewalk improvements, pavement by cold planning, fences, and trees; relocation of signs, mailboxes, and trees; installation of hot mix asphalt pavement, concrete curbs, sidewalk, driveways, curb ramps, and root barrier; and other associated work.
Link to page -
South Maui District Resuracing (FY 2021)
Project No. 21-26 Contractor: Maui Kupono Builders Project Cost: $475,902.00 NTP: TBD Description: The project involves cold planning and resurfacing of various roads in the Kihei Village Subdivision. The scope of work includes cold planning; road resurfacing; pavement striping and markers; adjustment of manholes and water valves; and other incidental items.
Link to page -
Speed Tables - Humps at Various Locations (FY 2021)
Project No. 21-01 Contractor: Maui Kupono Builders Project Cost: $467,430.00 NTP: TBD Description: This project involves constructing speed tables ad speed humps at various locations, island-wide. The scope of work also includes cold planning sections of Haiku Road in Haiku, and Olinda Road in Makawao; road pavement replacement work on Front Street in Lahaina; installing pavement striping; installing, relocating, or replacing street signs; and other incidental items.
Link to page -
Upcountry/Paia-Haiku District Resurfacing (FY2020)
Project No. 20-11 Contractor: Maui Paving, LLC Project Cost: $1,242,925.00 NTP: November 8, 2021 Description: The project involves cold planing and resurfacing of various roads in the Upcountry and Paia-Haiku districts of Maui. The scope of work includes cold planing, road resurfacing, pavement striping and markers, adjustments of manholes and water valves, installation of signs, construction of speed tables and speed humps, and other incidental items
Link to page -
Upcountry District Resurfacing (FY 2021)
Project No. 21-25 Contractor: Maui Kupono Builders Contract Cost: $400,146.00 NTP: TBD Description: The project involves cold planning and resurfacing of Mahola Street, Alaea Street, Hiehie Street, Alaiki Place, Auoli Drive (Mahola Street to address 77/78), Ahina Place, Keola Place, Puapana Place, and Pamakani Place in Makawao, Maui. The scope of work also includes contruction of speed humps, reconstruction of existing speed humps, adjustment of manholes and water valves, pavement striping and markers, installation of signs, and other incidental items.
Link to page -
Waiale Road Drainage Improvements at Waikapu Gardens
Project No. 21-03 Contractor: Alpha Inc. Project Cost: $188,615.00 NTP: 05/01/2023 Description: The project involves the grading of a swale in the shoulder area and the installation of grated inlet catch basins, drainlines and perforated drainlines.
Link to page -
Waiehu Heights Drainline Replacement - Phase 3
Project No. 21-46 Contractor: Rojac Construction, Inc. Project Cost: $748,678.00 NTP: 08/22/2022 Description: The project involves the replacement of existing drainlines and drainage structures on portions of Kolani Place, Makiki Street, Haunani Place, and Anohea Way in Waiehu Heights subdivision. The scope of work also includes cold planning and resurfacing of the existing asphalt concrete pavement; replacement of existing speed humps; replacement of existing concrete curbs and gutters; adjustment of sewer manhole and water valve frames and covers; installation of sewerline concrete jackets; installation of pavement striping and markers; replacement of existing signs; and other incidental work.
Link to page -
West Maui District Resurfacing (FY 2021)
Project No. 21-13 Contractor: Maui Kupono Builders Project Cost: $570,208.00 NTP: TBD Description: The project involves cold planning and resurfacing of Dickenson Street, Kapunakea Street, Nahale Place, South Nahale Place, Ipukula Way, Huea Street, and Hoapili Street; repairing a drain manhole on Kapunakea Street, and reconstructing pavement in the vicinity of Kapunakea Street and Front Street. The scope of work includes cold planning; road resurfacing; constructing a new curb ramp and short section of sidewalk; pavement striping and markers; adjustment of manholes and water valves; and other incidental items.
Link to page