Current & Future Projects
-
Kaupakalua Road Pavement Reconstruction, Phase I
FAP No. STP-0365(010) Contractor: Hi-Built, LLC Project Cost: $4,796,353.55 NTP: 02/11/2019 Description: The project involves the removal of existing pavement down to the gravel subbase within the road right-of-way, installation of a new asphalt concrete pavement section with reinforcing geogrid, new rigid pavement (Portland Cement Concrete) section for a small portion of the roadway, installation of new pavement striping and markers, adjusting manhole/valves frames and covers where needed, removal/replacement of dented guardrails, removing/replacing signage and posts, and other incidental items.
Link to page -
Kaupakalua Road Pavement Reconstruction - Phase 2
Project No. STP-0365(011) Contractor: Maui Paving LLC Project Cost: 5,446,536.00 NTP: TBD Description: This project consists of the removal of existing pavement down to the gravel subbase within the road right-of-way, and installing a new asphalt concrete pavement section with reinforcing geogrid. The scope of work also includes installing new pavement striping and markers, replacement of existing water system, adjusting manhole/valves frames and covers where needed, removal/replacement of dented guardrails and removing/replacing signage and posts.
Link to page -
Kea Street Pavement Reconstruction
Project No. STP-0900(093) Contractor: Maui Paving, LLC Project Cost: $2,177,779.00 NTP: TBD Description: The project involves excavating the existing pavement to subgrade and reconstructing a new pavement section consisting of aggregate subbase, hot mix asphalt base course, and hot mix asphalt pavement (mix V); demolishing and replacing the existing concrete sidewalks and ramps in various locations; reconstructing monuments; adjusting valve boxes and manhole frames and covers; installing new pavement markings, signage, and reflective markers.
Link to page -
Kokomo Road and Makawao Avenue Pavement Recon.
FAP No. STP-0900(086) Contractor: Hi-Built LLC Project Cost: $4,546,797.82 NTP: 02/02/18 Description: The project includes reconstruction of Kokomo Road from Haiku Road to Mile Post 3.0, and Makawao Avenue from the intersection of Kokomo Road and Makawao Avenue to Piiholo Road with asphalt concrete pavement; hot mix asphalt base course and aggregate base section; construction of sidewalk, grass swales/shoulders, drain inlet and catch basin, sidewalk underdrain, stone wall, installation of mile posts, guard rail, hand rail, relocation of signs and mail boxes, replacement/reconstruction of portions of concrete/asphalt concrete driveways, installation of new pavement striping and markers; and other incidental items.
Link to page -
North Shore Greenway - Phase IV
FAP No. STP-0900(089) Contractor: Hawaiian Dredging Construction Project Cost: $1,726,200.00 NTP: 03/04/2019 Description: The project includes clearing and grubbing; earthwork; leveling shoulders; installing barrier; relocating and installing highway and non-highway facilities; constructing new bikeway pavement; transplanting existing foliage; installing pavement markings and signs; installing concrete bridge crossing over Kailua Stream; installing railing; and all other incidental work necessary to complete the project.
Link to page -
Pavement Rehabilitation of Various S. Maui Roads
FAP No. STP-0900(090) Contractor: Hi-Built LLC Project Cost: $4,691,488.70 NTP: 10/15/2018 Description: The project includes reconstruction and rehabilitation road work for Kulanihakoi Street, East Waipuilani Road, East Lipoa Road and East Welakahao Road. All work is located between South Kihei Road and Piilani Highway. The reconstruction road work will include removal of the existing pavement to subgrade and replacement with new asphalt concrete pavement, hot mix asphalt concrete base course, aggregate base and a reinforcing geogrid. The rehabilitation road work will include cold planing 2.5” of the existing pavement and overlaying with 2.5” new asphalt concrete pavement. Reconstruction work would also consist of replacement of concrete sidewalks, curbs, gutters, curb ramps and utility collars; installation of new pavement striping, markers and signs; existing drain lines that will be cured-in-place; and other incidental items.
Link to page -
Auhana Road Drainage Improvements
Project No. 18-46 Contractor: West Maui Construction Project Cost: $146,539.00 NTP: TBD Description: The project involves drainage improvements along Auhana Road in Kihei. The scope of work includes installation of catch basin, drainlines, and outlet structures; turf reinforcement mats; grassed berm; and other incidental items.
Link to page -
Emergency Drainline Replacement at Kuikahi Drive
Job No. 19-42 Contractor: Alpha, Inc. Project Cost: $893,718.70 NTP: 06/03/2019 Description: This project involves removal and replacement of existing drainlines within Kuikahi Drive between South Alu Road and Kualau Street and within South Alu Road at the vicinity of Kualau Street; concrete lining of an existing drainline; installation of new drainage structures; trench and pavement restoration; pavement reconstruction; adjusting or reconstruction of monuments; adjusting valve boxes and manhole frames and covers; installing new pavement markings; and other incidental items.
Link to page -
Emergency Generator for Lanai Baseyard
Job No. 18-44 Contractor: ELCCO Inc. Project Cost: $136,116.00 NTP: TBD Description: The work includes the furnishing of all labor, tools, materials, and equipment necessary to install an emergency generator for the Lanai Baseyard at 12th Street, Lanai City, Lanai, Hawaii.
Link to page -
Emergency Repair of Kahekili Highwway Culvert
Project No. 19-57 Contractor: Prometheus Construction Project Cost: $549,100.00 NTP: TBD Description: The project involves excavation and reinforced concrete work to repair a damaged culvert headwall, installation and soil nails, traffic control, and other incidental items
Link to page -
Haleakala Highway and Makawao Avenue Improvements
Job No. 14-55 Contractor: Maui Kupono Builders, LLC Project Cost: $1,050,417.73 NTP: 10/22/2018 Description: This project includes 1,000 LF of roadway widening and repaving along Makawao Avenue between Apana Road and Haleakala Highway. The scope of work includes removal of obstructions, relocation of utility poles, relocation of existing fire hydrants, grading, new roadway pavement structure, new AC curbs, concrete curb, pavement striping, traffic sign installation, traffic signal modifications, grass swales, and other incidental items.
Link to page -
Hiolani Street Drainage Improvements
Job No. 16-18 Contractor: Goodfellow Bros., Inc. Project Cost: $934,888.00 NTP: TBD Description: This project consists of improving a portion of the existing severely eroded unlined earth ditch crossing Hiolani Street and Hololani Street in County of Maui and Pukalani County Club properties designated for drainage improvements with 48” drain lines, ditches, outlet channel and inlet channel improvements, field inlets, GRP invert, CRM walls, reconstructed GRP lining, and provide other work incidental to the project
Link to page -
Kahakuloa Bridge Stream Channel Lining Repair
Project No. 19-48 Contractor: Global Specialty Contractors Project Cost: $170,177.06 NTP: TBD Description: The project involves instream excavation, concrete rubble masonry, concrete work, and other incidental items for the repair of the Kahakuloa Bridge abutment.
Link to page -
Kahului Drainline Replacement
Job No. 18-22 Contractor: Hawaiian Dredging Project Cost: $2,050,482.00 NTP: TBD Description: This project involves replacement of existing drainlines at Molokai Akau Street, Pohaku Street, and the intersection of Wakea Avenue and Alamaha Street, installation of reinforced concrete jackets at existing sewerlines and waterlines, trench restoration, pavement resurfacing, installation of speed humps, pavement striping, and other incidental items.
Link to page -
Kahului Fire Station Sidewalk Improvements
Job No. 18-03 Contractor: Betsill Brother LLC Project Cost: $110,986.97 NTP: TBD Description: The project involves constructing a concrete curb and sidewalk along the Kahului Fire Station frontage, demolition of existing walls, grading, construction of grade walls, relocation of fire hydrants, and striping.
Link to page -
Kalana Pakui AC Replacement
Project No. 18-26 Contractor: MEI Corporation Project Cost: $54,525.46 NTP: TBD Description: The work includes the furnishing of all labor, tools, materials, and equipment necessary to install a replacement air conditioning system for Kalana Pakui building, Wailuku, Hawaii.
Link to page -
Keanae Road Safety Improvements
Project No. 16-21 Contractor: Prometheus Construction Project Cost: 3,654,800.00 NTP: TBD Description: The project involves rockfall mitigation above Keanae Road and roadway improvements on Keanae Road from Hana Highway down to the shoreline. The rockfall mitigation scope of work includes rock slope scaling, rock bolts, concrete barrier, rockfall fencing, rockfall netting, and associated work. The roadway improvements scope of work includes pavement reconstruction, pavement resurfacing, regarding, metal guardrail, relocation of standpipe, pavement striping and markers, roadside signs, and associated work.
Link to page -
Keonekai Road Drainline Replacement
Job No. 18-45 Contractor: Hawaiian Dredging Construction Company, Inc. Project Cost: $1,326,427.00 NTP: TBD Descriptoin: This project involves replacement of existing drainlines at Keonekai Road, installation of reinforced concrete jackets at existing sewerlines and waterlines, trench restoration, pavement resurfacing, installation of speed tables, pavement striping, and other incidental items.
Link to page -
Lanai District Resurfacing (FY 2018/2019)
Job No. 18-17 Contractor: Peterson Bros Project Cost: $419,669.80 NTP: TBD Description: The project involves cold planing and resurfacing Houston Street (from Third Street to Sixth Street), Houston Place, Palawai Street, and Eleventh Street; adjusting manholes and water valves; installing pavement striping and markers; and other incidental items.
Link to page -
Molokai Baseyard Improvements, Phase I
Job No. 14-32 Contractor: F & H Construction Project Cost: $7,528,000.00 NTP: 01/08/2018 Description: The new baseyard will consist of one Administrative Building, approximately 2,560 SF, one Maintenance Building, approximately 7,440 SF, and one Vehicle Storage Building, approximately 3,960 SF, located in Naiwa, Molokai.
Link to page -
Paia / Haiku District Resurfacing
Project No. 19-06 Contractor: Maui Kupono Builders Project Cost: $705,436.00 NTP: TBD Description: The project involves cold planing and resurfacing Kauhikoa Road from Kaupakalua Road to vicinity 1105 Kauhikoa Road. The scope of work includes removal of obstructions; road pavement work; road widening work; adjusting manholes and water valves; pavement striping and markers; and other incidental items.
Link to page -
Paia-Haiku District Resurfacing (FY 2019)
Job No. 18-32 Contractor: Maui Kupono Builders, LLC Project Cost: $486,364.20 NTP: 10/21/2019 Description: The project involves cold planing and resurfacing E. Kuiaha Road from Hana Highway to Waipuhia Road and Haiku Road from E. Kuiaha Road to Peahi Road and from the vicinity of 1565 Haiku Road to W. Kuiaha Road. The scope of work includes pavement striping and markers, adjusting water valves, and other incidental items.
Link to page -
Pukalani Terrace Subdivision Roadway Conditions
Job No. TBD Contractor: TBD Project Cost: TBD NTP: TBD Description: The County of Maui, Department of Public Works, recognizes the poor roadway conditions throughout the Pukalani Terrace Subdivision. Unfortunately, these roads have a poor quality material beneath the asphalt pavement which is not suitable to support a new pavement layer. Therefore, we are not able to simply repave the roads and instead complete pavement reconstruction is required throughout the subdivision. This expensive treatment reduces the length of roads that can be addressed per year.
Link to page -
Roundabout at Maui Lani Pkwy and Kamehameha Ave.
Job No. 16-50 Contractor: Goodfellow Bros. Project Cost: $2,670,853.75 NTP; TBD Description: This project involves the construction of a new roundabout at the intersection of Maui Lani Parkway and Kamehameha Avenue in Kahului, Maui. The scope of work includes removal of obstructions; road pavement work; construction of curb ramps, sidewalks, adjusting manholes, irrigation and water valves, storm drain culvert, culvert headwall, crosswalk pedestrian beacons; pavement striping and markers; replacing street signs; and other incidental items.
Link to page -
South Maui District Resurfacing (FY 2019)
Project No. 19-36 Contractor: Maui Kupono Builders, LLC Project Cost: $449,711.40 NTP: 10/28/2019 Description: This project involves cold planing and resurfacing Halelani Place, Alahele Place, Kahakai Street, Hoonanea Street, Waipahe Street, Wailana Place, and West Welakahao Street; adjusting manholes and water valves; pavement striping and markers; and other incidental items.
Link to page -
Speed Table-Humps (FY 2019)
Project No. 19-01 Contractor: Sonny Vicks Paving, Inc. Cost: $199,261.30 NTP: TBD Description: This project involves constructing speed tables and speed humps at various locations island-wide. The scope of work includes cold planing sections of Shaw Street in Lahaina & road pavement work; installing speed tables & humps; installing pavement striping and markers; installing or replacing street signs; and other incidental items.
Link to page -
Upcountry District Resurfacing (FY 2017)
Job No. 17-54 Contractor: Maui Kupono Builders, LLC Project Cost: $769,290.67 NTP: 3/12/18 Description: The project involves cold planing and resurfacing Lower Kula Road (from Kula Highway to Kalialinui Bridge, and from Omaopio Road to Kula Highway) reconstructing pavement at Hololani Street (from Hokulani Street to Lolani Street), adjusting manholes and water valves; replacing speed humps; pavement striping and markers; and other incidental items.
Link to page -
Wailuku/Kahului District Resurfacing (FY 2019)
Project No. 19-05 Contractor: Maui Kupono Builders, LLC Project Cost: $276,415.00 NTP: TBD Description: The project involves cold planing and resurfacing S. Kamehameha Avenue (S. Papa to approx. 766 feet south), Halenani Drive, and Naniloa Drive (Halenani to end) and reconstructing a portion of S. Kamehameha Avenue (S. Papa to approx. 108 feet south). The scope of work includes road resurfacing; road reconstruction work; pavement striping and markers; adjustment of manholes and water valves; replacement of signs; and other incidental items.
Link to page -
Waipoli Road Ditch Improvement
Job No. 15-28 Contractor: Goodfellow Bros., Inc. Project Cost: $1,596,250.00 NTP: TBD Description: The project consists of improving a portion of the existing severely eroded unlined earth ditch crossing Harold W. Rice Memorial Park and along Waipoli Road with 36” and 42” drain lines, ditches, outlet channel, field inlets, drain manhole, repave existing driveways, construct shoulders, install guardrails, repair existing walls, and provide other work incidental to the project.
Link to page -
Wailea Alanui Drainline Repair at STA 50+35
Job No. 17--63 Contractor: Norrie Construction Project Cost: $571,201.00 NTP: TBD Description: This project involves installing a cured-in-place lining at an existing drainline and installation of a new drain manhole on Wailea Alanui Drive.
Link to page -
West Maui District Resurfacing (FY 2018)
Job No. 18-29 Contractor: Maui Kupono Builders Project Cost: $365,348.92 NTP: 05/01/2019 Description: The project involves cold planing and resurfacing Fleming Road and Wainee Street (Dickenson Street to Shaw Street), pavement striping and markers, adjusting water valves and storm drain/water/sewer manholes, and other incidental items.
Link to page