ADDENDUM NO. 1
IFB # DWSP 2013-03
FURNISH ALL LABOR, TOOLS, MATERIALS, EQUIPMENT NECESSARY TO REMOVE AND REPLACE WITH NEW, ONE PRODUCT LUBRICATED PUMP INCLUDING, SHAFT BEARINGS, PACKING GLAND RINGS, ONE 0.25 INCH CONTINUOUS STAINLESS STEEL BUBBLER TUBE, MOTOR, 1.5 ID PVC CHASE TUBE, AND ASSOCIATED COMPONENTS FOR WAIPUKA WELL 560 FOR THE DEPARTMENT OF WATER SUPPLY, COUNTY OF MAUI
OCTOBER 16, 2012
TO ALL BIDDERS:
The following is a clarification to the Bid Proposal of the document. Bidders are required to incorporate all necessary changes, additions, or deductions in their proposal.
8. PUMPING UNIT AND APPURTENANCES
8.2.2 Minimum pump bowl efficiency at design point. 82%
CHANGE TO: 8.2.2 Minimum pump bowl efficiency at design point. 80%
9. PUMP ASSEMBLY
9.8 The pipes shall be Schedule 80
CHANGE TO: 9.8 The pipes shall be Schedule 40
|