ADDENDUM NO. 1
IFB # DWSP 2013-06 FURNISH ALL LABOR, TOOLS, MATERIALS, AND EQUIPMENT FOR ROAD PATCHING FOR THE DEPARMENT OF WATER SUPPLY, COUNTY OF MAUI
DECEMBER 3, 2012 TO ALL BIDDERS: The following is a clarification to the Bid Proposal of the document. Bidders are required to incorporate all necessary changes, additions, or deductions in their proposal.
SPECIAL PROVISIONS: 1. Remove cold mix and patch trench with 12 inches asphalt concrete.
Shall read: 1. Need to do a 12 inch cut back from original cut line.
SPECIAL PROVISIONS: 2. Trench restoration details will be deleted from bid documents.
SPECIAL PROVISIONS: 3. Six (6) inches of base.
Shall read: 3. If there is a base that is present, remove only Two (2) inches from road surface.
SPECIAL PROVISIONS: 7. Temporary and permanent striping, flaggers, traffic control and off duty police officer.
Shall read: 7. Temporary and permanent striping, flaggers, traffic control and if needed off duty police officer.
SPECIAL PROVISIONS: 11. Twelve (12) inches of cutback will be deleted from bid documents.
|